01 · VISIT DETAILS
▲
02 · PLANT IDENTITY
▲
ANCILLARIES & DRAINAGE
F-GAS THRESHOLD
ENTER CHARGE
F-Gas threshold: ≥ 5 tonnes CO₂e requires annual inspection. CO₂e = charge (kg) × GWP ÷ 1000
03 · SERVICE CHECKLIST
0 / 13 complete
▲
04 · MEASURED READINGS
▲
COOLING
HEATING
BOTH MODES
Both mode: fill in Cooling and Heating tabs — the engine will analyse all available data.
05 · REFRIGERANT MOVEMENT
▲
All refrigerant movements must be logged per F-Gas Regulation 517/2014. Records retained for minimum 5 years.
06 · FOLLOW-UP & ACTIONS
▲
Run diagnostic to enable BLOODHOUND / ZEUS routing.
07 · MATERIALS & PARTS USED
0 items
▲
| QTY |
UNIT |
DESCRIPTION |
PART / REF NO. |
|
No items added
List all materials, parts and consumables used. These feed directly into the works invoice — pricing handled in ZEUS.
08 · DIAGNOSTIC RESULT
| INDICATOR | VALUE | STATUS | DETAIL |